Resource planning (Rich Client)
In aquas Project Planning it is possible to add resources to a task. To assign a resource to a task, you need to press the
button. Then you can select a resource from the project in the task.
Resources can report their work at tasks by right-clicking them, selecting Edit and then switching to tab Report Work.
The resource which is assigned can also report the work directly on the home screen via Widget Tasks.
In the project plan you can see the resource usage. To do so, click on Resource Usage in the ribbon.
Related Articles
Planning board (Rich Client)
Within the planning board, you have the option to pull or push elements into your sprint. The project structure is displayed on the left-hand side, all your elements in the centre, and the active sprints on the right-hand side. You can push or pull ...
Rich Client
System Requirements – aqua Rich Client Minimum software and hardware requirements are: Intel Core Duo 2x2Ghz, AMD Duo Core Processor 2x2Ghz or more 4 GB RAM or more 1 GB free hard disk space Windows 10, Windows 8.1, Windows 8, Windows 7 Microsoft ...
Web Client vs Rich Client
Feature Additional Info WebClient Rich Client Homescreen x x Configurable Only on premise x User administration x x Roles x x Creation x x Project x x Usage statistics x SAML 2.0 x Project configuration x x Fields x x ...
Step Designer (Rich Client)
The step designer allows to create steps and conditions to create manual test steps and to extend it with automated tests. A default test condition and a test step are available. Conditions have an instruction field that can be specified, ...
Permissions overview (Rich Client)
In aqua you can define roles with more than 100 different permissions, that can be activated separately. Some of them can be activated as Assigned or Owned. If you select Assigned, the user is allowed to change items which he is assigned to. If you ...